Engineering
a) Well equipped in house design facilities which includes
Manual drawing
boards & CADD based design facilities with plotters.
b) Latest updated relevant applicable standards
Production
a) Spot welding machines
b) Screen rollers
c) Compressor 7.5 H.P
d) Arc & Tig welding facilities
e) Gas cutting Equipment
f) Hydrostatic test rig (Gang Testing)
g) Hydrostatic test rig High Pressure
h) Air Hydro pump 30000 PSI
i) Test benches for Screwed & Socket weld items.
j) Pressure drop testing facilities.
CNC
Division
k) CNC Lathe Chuck dia 350mm.
l) Horizontal Machining Center (HMC) Makino a 55 Pallet size
400mm X 400mm.
m) Vertical Machining Center. Table 1300mm X 660mm.